Construction of bases, heavy retaining walls, a sewer riser, dissipator structure, barriers, drainage and associated works adjacent to the live motorway on a difficult site.
As a part of the M2 Upgrade project with Leighton Contractors, Timbermass Constructions was awarded the contract to both lengthen and widen the the Christie Road overbridge.
Snap shot of various water retaining structures of all sizes and applications.
Construction of a three span, 60m deck bridge ove the Yass River.
Single and multi span bridges, precast and cast-insitu.
As part of the Sydney Water Priority Sewerage Scheme, a new sewerage treatment plant was built at Brooklyn including contruction of
Construction of pumping stations, wetwell chambers, chemical dosing units and plant room buildings to Wilberforce, Richmond and Freemans Reach, including structural design and construction of suspended post tensioned slabs.
p: (02) 9688 3414 a: 144 Toongabbie Road, Toongabbie, NSW, Australia
Designed & Powered by Snap Seven Hills NSW